particle board machine    
  particle board machine   particle board machine   particle board production line machine   particle board production line machine
 
    Home     |     About Us     |     Products     |     News Center     |     Down Load     |     Contact Us    

   
   
   Products Catagory
Particle Board Production Line
Short Cycle Hot Press
Plywood Machinery
Veneer Peeling Machine
Door Skin Hot Press
MDF/ HDF Production line
OSB Production Line
Block Boad Making Machinery
Other Accessories



    News Center
Company News
Industry Dynamics
Case Presentation



    Contact Us
Contact:   Mr. John Zhang
Mobile/ WhatsApp:  +86-139 56199239
WeChat:  +86-139 5619 9239
E-mail:  john_chng@163.com
Skype:  slt.yhc
 

Scan Code Adding WeChat



 
   Home >> Products Center >> MDF/ HDF Production Line
 

The medium density fiberboard is processed(through sections of material preparation, fiber preparation, regulating and supplying glue, forming and hot pressing, post-processing, and sanding) to be 450-880kg/cm³ from the raw material of wood fiber or other plant fiber. And the raw material can be woods, brush woods, and the processing residues of woods.

 
 Raw Material  Wood branch, Waste wood, Log, etc    Capacity  30,000~300,000cbm/year
 Board size  4×8ft, 6×9ft, 6×8ft, 6×12ft, etc    Working days  300days, 22hours/ day
 
1) Material preparation section

After the raw materials are sawed to wood pieces in certain sizes by wood chipper and stored in material warehouse, clean up to the impurities, such as fines, earth and sands, in the wood pieces through screening.

 
 
 
2) Fiber preparation section

Feeding the wood pieces into the boiling apparatus evenly to cook and soften through sequeezing and dewatering after transfering them into the defiberator pre-heating bins/humidifying bins by the transfering equipment in order to separate the fibers easily. The cooked wood pieces will be seperated to fibers under the forces of heat and machine. Then mix the wet fibers and heated dry medias, and keep the fibers suspending in the drying medias under the high speed force of the high-pressure air flow, and the moisture in the fibers will be taken away by the dry media. Afterwards, the fiber will drop the force of cyclone separator onto the reversible belt conveyor to be transferred to the pavement bins for temporary storing.

 
 
 

3) Forming and hot pressing section

The dried fibers are transferred into the paver metering bin by the pneumatic system, and the paving rolls of the mechanic vacuum paver paves the fibers onto the circular conveyor. And the air will be sucked away by the mesh belts, under which there is vacuum case forming negative pressure, as while, the fibers are sucked on the mesh belt and form slabs gradually. In the next moment, the fluffy slabs will be compacted by the pre-press machine, and be sawed vertically and longitudinally to lengths required, and then the slabs will be transferred to the loader by the synchronous conveyor, speed-up conveyor, storing-board conveyor and extensible conveyor succecssively. After being loaded by the loader, the small machine in the loader will transfer the slabs together with the cantilever belt into the hot press machine. During the tranferring process, the shovel at the front of the conveyor belt push the compacted slabs out, and the rough boards will enter the unloader as well as slabs get to the preset position when the small machine arrives at the termination. Then the small machine draws back as the belt revolve forward. The revolving speed of the belt is equal to the back speed of the small machine, so that the slabs are relatively static and stay on the hot press. The slabs will be formed to specified thickness under the temperature and pressure of the thermal compressor, and the inside glues will solidify. At last boards of certain strength will be made. Then the boards will be unloaded onto the carrier by the unloader, and unloaded and transferred to the next process by the discharge machine gradually when the suspension coop goes down layer by layer.

 
 
 

4) Finishing and sanding section

The thermal-compressed slabs will be cooled through turning over and transferred to the vertical and horizontal sawing machine by the roller conveyor to be sawed into medium density fiberboard in required sizes, and at last, to be separated, stacked, packed and transferred to the warehouse after sanding.

 

 
 
 
 
Working Video
MDF Production Line for High Thickness        
       
 
 
 
 
 
 
 

 
 
twitter   linkin   youtube   facebook
 
HOME      |      ABOUT US      |      PRODUCTS      |      NEWS CENTER      |      DOWN LOAD      |      CONTACT US
      back to top
  Tel: +86-133 0539 8400      Mobile/ WhatsApp/ WeChat: +86-139 5619 9239        E-mail: john_chng@163.com  
      Back to Top
  Copy Right@China Geelong Machinery Manufacture Company Limited. 2009